Beyaz Park 3. Etap
- Delivery
- May 2028
- Units
- 63 + 4 shops
Developer: Beyaz Insaat
21 projects

Developer: Beyaz Insaat

Developer: Beyaz Insaat

Developer: Beyaz Insaat

Developer: Bakirci Yapi

Developer: Tenet Insaat

Developer: Luxera Gayrimenkul

Developer: Bakirci Yapi

Developer: Bakirci Yapi

Developer: Akzirve Gayrimenkul

Developer: Mist Insaat

Developer: Artas Insaat

Developer: Is GYO

Developer: Sur Yapi

Developer: Beyaz Insaat

Developer: Yesil GYO

Developer: Nef (Timur Gayrimenkul)

Developer: Tekfen Gayrimenkul

Developer: Nef (Timur Gayrimenkul)

Developer: Nef (Timur Gayrimenkul)

Developer: Artas Insaat

Developer: Beyaz Insaat
Property Istanbul lists 21 projects in Topkapi: 14 completed, 4 under construction, 1 in planning and 2 cancelled, from 12 developers.
Topkapı is the quarter just outside the old land walls of Istanbul, on the European side. It is named after a gate in the walls, not after Topkapı Palace, which stands about 5 km to the east. The projects we list are all in Zeytinburnu district, on former industrial land west of the walls. Property Istanbul lists 21 projects in Topkapı: 14 are completed, four are under construction, one is in planning and two were cancelled.
Istanbul's intercity bus terminal stood here until it moved to Bayrampaşa in 1994. The ground outside the walls is now Topkapı Kültür Parkı, where the Panorama 1453 History Museum opened in 2009.
In 2005 the city was preparing projects to convert 400 hectares of industrial land in Topkapı. Maltepe neighbourhood counted 440 residents in 2000 and 9,948 in 2024.
Projects are large. Only four have fewer than 150 units, and ten of the 21 were planned with 300 or more. The largest is Topkapi 29 by Akzirve Gayrimenkul, completed in 2024 with 1,441 flats in 16 blocks.
Four projects under the Inistanbul name stand side by side opposite the Davutpaşa campus: Inistanbul Lokal with 938 units, Inistanbul Gala with 788, Inistanbul Konsept with 550 and Inistanbul Hayat with 404.
Five projects are not finished: Bakirci Zenit Topkapi, with 364 homes plus offices and shops, due in 2028, Luxera Topkapi, with 238 units, due in December 2027, Tenet Topkapi Prime, with 167 apartments, Beyaz Park 3. Etap, with 63 apartments and four shops, due in May 2028, and Bakirci Kaya Residence, with 96 homes, in planning. Elexia Topkapi and Tekfen Topkapi were cancelled.
Twelve developers are on the list, and 16 of the 21 projects include shops or offices. 2+1 flats are offered in 17 projects, 1+1 in 16 and 3+1 in 15.
The M1A metro has stopped at Davutpaşa-YTÜ since 1994. It runs to Yenikapı. The T1 tram reached Topkapı in December 1992 and continues to Sultanahmet, Eminönü and Kabataş. The T4 tram starts at Topkapı and runs north to Mescid-i Selam. The metrobus has run along the D-100 since September 2007.
All 21 project sites are within 1 km of a rail stop in a straight line, and 20 are within 750 metres. An M1A station is nearest for 12 and a tram stop for nine.
Koç University Hospital opened in 2014 on Davutpaşa Caddesi in Maltepe. Istanbul Yeni Yüzyıl University has its campus in the quarter, and Yıldız Technical University's Davutpaşa campus is across the district line in Esenler.
Topkapı suits buyers who want a flat in a large, recent compound close to the old city, with metro, tram and metrobus nearby. It is less suited to buyers who want a garden, a sea view or a quiet street: this is a quarter of apartment blocks beside the D-100.
Call or send a message and we will look for it with you.